A. EVENT DESCRIPTION | B. INVESTIGATION/CORRECTIVE ACTION ACCOMPLISHED | C. STATUS | |||||
---|---|---|---|---|---|---|---|
REF NO. DATE |
A/C S/N ENG. S/N OPERATOR | FAILURE EFFECTS | FAILURE CAUSE | CONFIRMED INVESTIGATION RESULTS | RATE PER 1000 HRS | CORRECTIVE ACTION (Ref. A.D. SB. SIL etc.) | EROPS SIGNIFICANT MANDATORY ACTION OPEN. CLOSED. |