Search
Displaying 1 to 10 of 32 items.
… December 17, 2019 Railway Equipment Reflectorization Rules (PDF, 66 KB) On this page 1. Short Title 2. Purpose, … “freight car” means a car, designed to carry freight on rail and includes a caboose and a service equipment car. 3.5 … of dirt, grime, or ice resulting from the normal railway operating environment. 3.8 “railway equipment” means any …
57.917
… cars and loaded intermodal portable tanks. “ Permanent Rail Joint ” means any rail joint that meets either of the … Territory; 30 MPH in Non-signaled Territory without Broken Rail Detection Technology that meets the requirements … 4.1.5; and 40 MPH in Non-signaled Territory with Broken Rail Detection Technology that meets the requirements …
36.213
… which the movement is to be operated. Proper Authority The rail traffic controller or the appropriate railway … When moving at RESTRICTED speed, be on the lookout for broken rails. When a broken rail is detected, the movement must be stopped …
13.342
… performing the duties of: conductor, assistant conductor, flagman, foreman, locomotive engineer, pilot, rail traffic …
0.56
… 1. Time The 24 hour system will be used and will be expressed in … The digits 2359 or 0001 will be used to express the time at midnight. 2. Watches Every conductor, assistant … in a 24 hour period; (ii) set it to reflect the correct time if it reflects a variation of more than 30 seconds; …
90.216
… by the locomotive engineer as prescribed by the rule. 17. Headlight Movements headed by equipment equipped with a headlight must display the headlight: (a) at full power in the direction of travel …
7.189