Search
Displaying 1 to 10 of 128 items.
… criteria Criteria (with threshold) Traffic volume AADT Footnote * exceeds 100,000 Train volume Average of 150 … separation. Terms to know Annual average daily traffic (AADT): The average daily vehicular traffic volume for a given … of the average number of trains per day multiplied by the AADT at a grade crossing. Highway functional classification : …
2.657
… Rail Safety Bulletins Bulletin: 2012-001 (PDF, 257 KB) Bulletin 2012-001 Second Train Event Warning Sign Description … Ottawa, ON, K1A 0N5, Tel.: 613 998-2985 Fax: 613 990-7767 E-mail: railsafety@tc.gc.ca https://www.tc.canada.ca …
47
… Minister or any authorized delegate under the RSA. Note: Failure to provide all necessary information and … engineering principles. A professional engineer shall take responsibility for the engineering work." Recommended … operations. In making this determination, the Minister may take into consideration the information provided by the …
59.597
… Guideline on Applying for Exemption or Filing of a Notice of Exemption (PDF, 187 KB) … associations and organizations after the end of the 60-day assessment period, in the interest of promoting railway … information requested by TC Rail Safety), extend the 60-day period for granting an application for an additional …
102.072
… 3. Crossing Surface 4. Railway Crossing Sign and Number of Tracks Sign 3. Crossing Surface 3.1 The … outer edge of road approach shoulder; or, where there is no curb or shoulder, 2.0 m to 4.5 m from the edge of the … travelled way; The railway crossing signs must be located no closer than 3.0 m from the nearest rail; Where there is …
58.753
… Figure 5-1 and in accordance with Grade Crossing Surface - Cross Section, and must be smooth and continuous. Figure 5-1 … surface must be continuous. Grade Crossing Surface – Cross Section The following list outlines the maximum and … difference between the road approach gradient and railway cross-slope, or the railway gradient and the road approach …
101.411