Search
Displaying 31 to 40 of 55 items.
… Non-Signalled Sidings (a) When two opposing train(s) or transfer(s) are to be lined into the same non-signalled … before the signal to permit operation of either train or transfer into the siding is requested. (b) At meeting points, the RTC must not line a train or transfer into a siding until the switch at the opposite end …
78.944
… Instructions may be issued by a signalman when necessary. 602. Proper Signal Indications Required (a) Except in case of …
3
… movement(s). TOP when SCT is applicable or specified by special instructions. Other forms of protection when specified by special instructions. On tracks where kicking is permitted … NMT Rule 841 TOP when SCT is applicable or specified by special instructions. Other forms of protection when …
21
… a valid certificate of rules; and (b) when conditions permit, require those to whom the TOP is read aloud, to read …
54.29
… by wheel flange, a member of the crew must manually line the switch and ensure the points are properly lined …
9.845
… vehicles, we are witnessing a pivotal shift in motor vehicle technology that will transform many aspects of … route selection, safety drivers and remote operations, and passenger safety, among others. An annex with best practices … technologies; adapting infrastructure; and managing passenger transportation (including public transit and …
140.9