Search
Displaying 161 to 170 of 384 items.
… the flex manifold does not use the transfer-tube design and is less labor intensive during removal and installation of the engine fuel nozzles. Since … resulted in two of the above events. Although the primary and secondary sealing features at each nozzle provide …
5.993
… the crew reported that the rudder control became frozen and the elevator control was stiff. The pilots were able to … one inch of ice in the belly of the fuselage, with rudder and elevator pulleys and cables situated within the ice. Once the ice had melted, …
5.997
… issue 1/98, the operator noted that the attach point and firewall moved when force was applied. Further … reported cases, the stabilizer pulley bracket was cracked and the rivets were sheared. These rivets attach the bracket and nose gear mount fitting. This failure weakens the gear …
3
… AL 2006-04 18 September 2006 Overhaul of Flap Actuators Operators of Bombardier … exhibited high wear rates. It was determined that some overhaul facilities may have been identifying the actuator as … for backlash until 3000 hours in service following the « Overhaul ». If the ball screw and nut assembly have not been …
11.24