Search
Displaying 71 to 80 of 111 items.
… of an engine, the employee in charge of the snow plow must sound engine whistle signals 14(f) and 14(l). All other …
75.3
… the crew on a movement pick up the signals. (f) When a rail break has been detected by an engineering employee and … and how such location is marked in the field, by either a Rail Break Sign or foreman, at the break. Signals required by …
18.406
… and snow is three inches or greater above the top of rail; the crew has experienced unusual braking conditions or … there is no fence or other barrier between them, moving rail cars not headed by an engine or when headed by a … use. (f) When advised by special instructions that rusty rail or other conditions may exist, occupancy of crossings …
20.988
… may be displayed to either side of the track. (e) When a rail break has been detected by an engineering employee and … and how such location is marked in the field, by either a Rail Break Sign or foreman, at the break. Flags required will …
25.549
… 351. Application On portions of the railway so specified by special instructions, the use of the main track will be governed by the Special Control System. 352. Supervision Movements and track … who will issue instructions as may be required. 353. SCS Special Instructions Special instructions necessary to govern …
30