Search
Displaying 51 to 60 of 159 items.
… Mandate The Review process Scope of the Review Panel roles and responsibilities Secretariat roles and responsibilities Key deliverable and timeline Official languages Confidentiality Context …
53.495
… that culverts are sized to accommodate the normal flows, and that they have sufficient structural capacity to handle the applied loads. 3.2 - Design and Installation of New Culverts Each railway authority's CSMP should specify procedures for the design and installation of new culverts. The culvert design and …
18
… Department of Transport require major Canadian passenger and freight railways implement physical fail-safe train … group with representatives from the railways, the unions and Transport Canada to study the issue of fail-safe train … with a special focus on the high-speed rail corridors and to provide Transport Canada with options and …
17.858