Search
Displaying 41 to 50 of 88 items.
… cooperation. Sincerely, Michael DeJong Director General Rail Safety c.c.: Mr. W. Phillips, TCRC-MWED Mr. S. Hadden, … or 32.2.(3) of the RSA. Michael Dejong Director General, Rail Safety July 9, 2021 Date … Order Pursuant to Section …
1.462
… ; and Part A (vii) of the General Rules of the Canadian Rail Operating Rules . The exemptions are subject to certain … . Sincerely, Michael DeJong Director General Rail Safety Encl. Notice of Exemption X 21-08 c.c.: Mr. W. … and Part A (vii) of the General Rules of the Canadian Rail Operating Rules is in the public interest and is not …
16.946
… which the movement is to be operated. Proper Authority The rail traffic controller or the appropriate railway … When moving at RESTRICTED speed, be on the lookout for broken rails. When a broken rail is detected, the movement must be stopped …
13.342
… performing the duties of: conductor, assistant conductor, flagman, foreman, locomotive engineer, pilot, rail traffic …
0.56
… 1. Time The 24 hour system will be used and will be expressed in … The digits 2359 or 0001 will be used to express the time at midnight. 2. Watches Every conductor, assistant … in a 24 hour period; (ii) set it to reflect the correct time if it reflects a variation of more than 30 seconds; …
90.216