Search
Displaying 501 to 510 of 991 items.
… appropriate in the Canadian railway environment. ETC Level 1 through 3 systems are designed as overlays on the existing train control system, while the ETC Level 4 system includes a complete replacement of the existing … Level 1 ETC system associated with the result 2.16% of all 2007-2016 RODS occurrences (22 of 1,018) Level 3 …
0.533