Search
Displaying 361 to 370 of 400 items.
… Non-Signalled Sidings (a) When two opposing train(s) or transfer(s) are to be lined into the same non-signalled … before the signal to permit operation of either train or transfer into the siding is requested. (b) At meeting points, the RTC must not line a train or transfer into a siding until the switch at the opposite end …
78.944
… 805. Manual and Other Interlockings not specified in these rules – Protection of Track Units and Track Work See special instructions. 806. Automatic … the foreman must then unlock the box marked “switches”, and open the switch at the interlocking. The switch must not …
52.801
… a valid certificate of rules; and (b) when conditions permit, require those to whom the TOP is read aloud, to read …
54.29
… 104. Hand Operated Switches General (a) Operation of Switches - … spring, dual control or auto-normal switches operated by hand are considered hand operated switches, and all rules governing hand operated …
37.037
… Attention: All RPAS (drone) pilots File Classification No. : Z 5000-35 RDIMS … (CASA) is a reminder to Remotely Piloted Aircraft Systems (RPAS) pilots that airspace around and over a forest fire is … For more information concerning this issue, contact the RPAS Centre of Expertise at 1-800-305-2059 or …
25.292