Search
Displaying 81 to 90 of 111 items.
… Non-Signalled Sidings (a) When two opposing train(s) or transfer(s) are to be lined into the same non-signalled … before the signal to permit operation of either train or transfer into the siding is requested. (b) At meeting points, the RTC must not line a train or transfer into a siding until the switch at the opposite end …
78.944
… 104. Hand Operated Switches General (a) Operation of Switches - semi-automatic, spring, dual control or … switches apply. (b) Except while being turned, each switch must be secured with an approved device. When a switch has been turned, the points must be examined and the …
124.869