Search
Displaying 41 to 50 of 62 items.
… Non-Signalled Sidings (a) When two opposing train(s) or transfer(s) are to be lined into the same non-signalled … before the signal to permit operation of either train or transfer into the siding is requested. (b) At meeting points, the RTC must not line a train or transfer into a siding until the switch at the opposite end …
78.944
… have been received from the signalman. (c) When a movement stops with its trailing end within interlocking limits, it … of an interlocking signal permitting it to proceed, stops before the leading locomotive or car has completely …
34.833
… 104. Hand Operated Switches General (a) Operation of Switches - semi-automatic, spring, dual control or … switches apply. (b) Except while being turned, each switch must be secured with an approved device. When a switch has been turned, the points must be examined and the …
124.869
… primary documentation 1.2 Applicability 1.3 State safety responsibilities and accountabilities 2.0 Chapter 2—State safety policy and objectives 2.1 State Safety Program policy … Data linkages to other projects 6.0 Chapter 6—State safety training and promotion 6.1 Internal training, communication …
138.767