Search
Displaying 7571 to 7580 of 13254 items.
… Who can use this guide? Scope of the Simplified Assessment Definitions What is the difference between a fully decked and an open vessel? Preparing for the assessment Carrying out the assessment step by step If your vessel does not pass Record …
66.28
… the working point and locked with a special lock. 2. A red flag is placed between the rails in each direction at least … from entering the working limits; (ii) place a red flag by day, and in addition, a red light by night, or when … of the prescribed flags as follows; (i) place a red flag at each identifiable location stated in the GBO to the …
28.234