1 |
AWM 573.10 (1)(a) |
Table of Contents
- Sections
- Descriptions
- Page numbers
|
|
|
2(a) |
AWM 573.10 (1)(b)(i) |
AMO name and identity
- Legal
- "Doing Business As" (D.B.A.)
|
|
|
2(b) |
AWM 573.10 (1)(b)(ii) |
AMO description
- Corporate office location
- Size
- Number of employees
- Facilities (general description)
|
|
|
2(c) |
AWM 573.10 (1)(b)(iii) |
Scope of work
- Ratings (Aircraft, Engine, Structures, etc)
- Scope (All non-specialized work, PT6 series, sheet metal structures, etc)
|
|
|
3 |
AWM 573.10 (1)(c) |
Compliance Statement (Manual certification)
- Appropriate certification statement confirming that the MPM and any incorporated document identified therein reflect the AMO certificate holder's means of compliance with CAR573.10(1)
- Signed by certificate holder
- Provision for Transport Canada approval signature
|
|
|
4 |
AWM 573.10 (1)(d) |
Amendment distribution and control
- Amendment procedures
- Disturbution
- Method to ensure that each copy of the MPM is amended within 30days of approval
|
|
|
5 |
AWM 573.10 (1)(e) |
List of Effective Pages
- Identify each page of the MPM
- Identify the amendment status of each page by date and/or revision number
|
|
|
6 |
AWM 573.10 (1)(f) |
Manual Distribution
- Name or title of each person who holds a copy
- Method of control (i.e. serial number)
|
|
|
7 |
AWM 573.10 (1)(g) |
Assignment of Responsibility
- Name and title of person (i.e. Org chart)
- Details of assigned functions
|
|
|
8 |
AWM 573.10 (1)(h) |
Maintenance standards
- Details of any standards other than manufactures recommendations
|
|
|
9 |
AWM 573.10 (1)(i) |
Regulatory and Technical Information
- List of regulatory and technical data available
- Description of how the company ensures that appropriate information is available when and where needed
|
|
|
10 |
AWM 573.10 (1)(j) |
Technical records
- Maintenance record keeping method
- Recording of defects
|
|
|
11 |
AWM 573.10 (1)(k) and AWM 573.15 |
Maintenance and retention of technical records
- Description of record keeping system
- Types of records kept
- Records must be retained for at lease 2 years
- Security of electronic recording keeping system, if used
|
|
|
12 |
AWM 573.10 (1)(l) |
Maintenance process control
- Description of task tracking to ensure that all work is completed before the maintenance release is signed
- List of company forms, if used
|
|
|
13 |
AWM 573.10 (1)(m) |
Quality Assurance Program
- Description of QA program· Internal and external audit frequency
- Recording findings and corrective actions
- Implementing corrective actions
- Follow-up actions to ensure effective corrective action
- Carry over results to the training program for employee update training
|
|
|
14 |
AWM 573.10 (1)(n) |
Parts and Materials
- Receiving inspection
- Storage of parts and materials
- Documentation verification
- Description of undocumented parts program, if applicable
|
|
|
15 |
AWM 573.10 (1)(o) |
Authorized signatures
- List of authorized persons
- Method of controlling signatures (ACA number, sample signatures, electronic signatures, etc)
- List of personal authorizations (ratings, limitations, etc)
- Authorization effectivity dates for each person
|
|
|
16 |
AWM 573.10 (1)(p) |
Non-destructive testing
- NDT methods
- Persons trained and authorized
- Personal qualifications
|
|
|
17 |
AWM 573.10 (1)(q) |
Organization overview
- Details of the scope of work listed on the AMO certificate
|
|
|
18 |
AWM 573.10 (1)(r) |
Aircraft Certification Authority and/or Shop Certification Authority (ACA/SCA)
- Description of required training
- Personal qualification assessment
|
|
|
19 |
AWM 573.10 (1)(s) |
Training and training records
- Initial training
- Update training
- Additional training
- Human factors training
- Method of evaluating the training for each individual (written or oral examinations, practical tests, etc)
- Training cycle
- Record keeping for training
|
|
|
20 |
AWM 573.10 (1)(t) |
Personal records
- What records are kept
- Must be retained for two years
- A copy must be given to each employee
|
|
|
21 |
AWM 573.10 (1)(u) |
Level of work
- Breakdown of work done at each facility
- Contractual arrangements for external facilities such as hangers, etc
- Provisions for work carried out at locations where facilities are not available
|
|
|
22 |
AWM 573.10 (1)(v) |
Maintenance arrangements
- Method of controlling work performed by sub-contractors
- Supervision of work
- Certification of work
- QA procedures
|
|
|
23 |
AWM 573.10 (1)(w) |
Service difficulty reporting
- Description of what is to be reported
- Reporting method
- Person responsible for reporting system
|
|
|
24 |
AWM 573.10 (1)(x) |
Calibration of tools and equipment
- List of calibrated tools
- Method of controlling calibration schedule
|
|
|