Policy Letter (PL)

Appendix B - Historical Aicraft Certification Project Completion Times

Service

Calendar days for project completion (80 %)1, 2, 3

Historical Data: Maximum Project Completion Times 3

Supplemental Type Certificate (STC)

149

1020

Limited Supplemental Type Certificate (LSTC)

84

656

Repair Design Certificate (RDC)

65

438

Part Design Approval (PDA)

217

412

Notes:

  1. 80% of projects fall within this duration.
     
  2. 20% of all projects extend beyond this time, some significantly due to a wide variety of factors generally associated with the administrative and technical complexity of a project, availability of Transport Canada staff and delegates, and the pace at which the client progresses through the certification process. Reference Appendix C for a more detailed explanation of the factors influencing project duration.
     
  3. Each of the durations listed are overall project times, that is, including time waiting for Transport Canada data review, client data and follow-up submission time, and time associated with the factors outlined in Appendix C.