Appendix 3 - Delegated Projects – technical review Checklist
Delegated Projects – Technical Review Check Sheet
Napa Project Number | Delegate Name/Number | |
Approval/Issue Number | Delegate Project Number | |
Number of projects since last review (20% freq) |
Project Title | |
Reviewer | ARASS Task Number | |
Date Reviewed |
Item | Description |
Auditor’s Comments/Results |
Audited By | |||
---|---|---|---|---|---|---|
N/A = Not Applicable, Fdg = Finding, PF = Parallel Finding, N/C = Not Checked | ||||||
1 | Has compliance been shown? If no, then corrective action should be pursued. | YES ? NO? | ||||
2 | Is a Finding Report Required? | YES ? NO? | ||||
3 | Has all the proposed documentation been included? Are all documents complete and current (fees, certificates, applications, signatures etc)? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
4 | Was registration verification done? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
5 | (Future item) Was an AD check done? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
6 | Does the compliance program or checklist identify the correct basis of certification for this modification? Is the use of earlier or later amendment levels/special conditions etc. justified? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
7 | Have operational and equipment rules that affect the design standard been incorporated? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
8 | Have policy, procedures and advisory materials been considered (SIs, APLs, ANs etc?) | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
9 | Has the compliance program identified all necessary areas in order to base an approval? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
Delegation Limitations | ||||||
10 | Is the approval within the scope of delegation? No delegate may approve any of the following: equivalent safety, exemptions, basic loads (except from approved data), fatigue or damage tolerance, flutter and aeroelastics analysis, compliance with ditching requirements, software, flight manual supplements, MMELs or supplements life-limits, Ads and FMECA. | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
11 | Has reference material been accurately cited? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
12 | Are diagrams and drawings accurate and complete? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
13 | Are components installed as per manufacturer’s specifications or other applicable data (including TSO)? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
14 | Are analytical assumptions appropriate? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
15 | Has aircraft eligibility been considered? This could include either the types of aircraft, the role or the configuration. | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
16 | Have noise and emissions standards been considered? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
17 | Was weight and balance, and CG considered? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
18 | Was test plan accepted/approved? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
19 | Do the test results support compliance? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
20 | Is the installation compatible with the aircraft design and procedures? (SwissAir) | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
21 | Is the flight manual supplement appropriate? Are the limitations affected? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
22 | Is the maintenance manual supplement appropriate? Are the limitations affected? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
Avionics/Electrical Systems | ||||||
23 | Has environmental standard (DO-160C TSO) been applied correctly? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
24 | If system performs an essential function, or is interfaced to essential equipment, has an FHA been performed correctly? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
25 | Is pilot-to-equipment interface acceptable (cockpit layout, controls accessibility, crew workload)? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
26 | Is electrical load analysis acceptable? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
27 | Is the EMI/RMI test accepted and completed? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
Flight | ||||||
28 | Was flight-testing coordinated with Headquarters? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
Human Factors | ||||||
29 | Has maintainability been considered? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
30 | Has accessibility been considered? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
31 | Has a cockpit review been conducted? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
32 | Has a cabin review been conducted? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
33 | Have placards been reviewed? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
Interior/Occupant Safety | ||||||
34 | Have applicable policy documents been considered (AC 25-17 etc.)? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
35 | Was an interior review conducted to verify aisle widths, exit access, equipment access, O2 in rotorburst zone, etc? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
36 | Were special factors/procedures passed on to Cabin Safety? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
37 | Was emergency equipment/ communications required by the Operational rules considered? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
Mechanical Systems | ||||||
38 | Has a safety assessment been conducted? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
Powerplants | ||||||
39 | Has the engine and/or propeller certification been considered? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
40 | Has rotorburst been considered? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
41 | Has a fire safety review been conducted? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
42 | Has performance been verified? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
43 | Has systems integration been reviewed/verified? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
Structures | ||||||
44 | Have all applicable loads been accurately established? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
45 | Has adequate static strength been established (assembly, sub-assembly, details)? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
46 | Have safe life, fail safe, or damage tolerance structures been adequately addressed? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
47 | Has fatigue been adequately addressed? | N/A ? OK ? Fdg ? PF ? PO ? N/C? | ||||
Function Summary (Delegated Projects – Technical Review Check Sheet) | ||||||
Items Completed By: | Date: |