Search
Displaying 81 to 90 of 96 items.
… a track unit(s) is required to move over a power-operated switch; (a) the switch must be lined by the RTC , except where the RTC gives … by a qualified employee; and (b) when a power-operated switch is operated by a qualified employee, and after the …
41.351
… Railway Extreme Heat and Fire Risk Mitigation Rules (PDF, 196 KB) In effect: June 15, … Locomotive inspection requirements 7.0 Requirements for a Fire Risk Mitigation plan for the prevention of fires on Railway rights-of-way 8.0 Fire Risk Mitigation plan reviews and municipal and other …
80.063