Search
Displaying 31 to 40 of 1072 items.
… 5.4 Contract Close Out 6. Conclusions 7. Recommendations and Management response and Action Plan Executive Summary … shall be conducted in a manner that will: stand the test of public scrutiny in matters of prudence and probity, … to IM/IT. A sample of IM/IT contracts were examined to test the effectiveness of controls in place over planning …
130.326
… of Canada’s marine domain, including territorial waters, and inland waterways, and at Canadian ports. Elements of this initiative include: Increased domain awareness, surveillance and tracking of marine traffic; Improved coordination and …
129.151
… includes each part of the rotorcraft (other than the main and auxiliary rotor structures) that: (1) Is necessary for … the tests. No intervening disassembly which might affect test results may be conducted. (b) Each rotor drive system … that provided by the engine cooling air downstream of the cylinders; (3) Each rotorcraft with altitude engines using …
128.719
… limit loads (the maximum loads to be expected in service) and ultimate loads (limit loads multiplied by prescribed … (1) applying ultimate loads to the structure in a static test for at least 3 seconds; or (2) dynamic tests simulating … multiplied by: (1) 1.33, for engines with five or more cylinders; and (2) two, three, and four, for engines with …
126.432