Search
Displaying 151 to 160 of 380 items.
… supervision and enforcement and to implement further safeguards to protect trains operating on non signalled … Advanced Train Control System which would provide further safeguards. Before concluding, I would like to note that …
1.182
… (R99-01 and R99-02) (signed by Minister on June 10, 1999) Transport Canada accepts both recommendations and … and will be ready for distribution by the end of 1999. They include the following: A video aimed at children … audiences across Canada for airing in early summer of 1999. As part of this initiative, Minister Collenette and a …
24.096
… Non-Signalled Sidings (a) When two opposing train(s) or transfer(s) are to be lined into the same non-signalled … before the signal to permit operation of either train or transfer into the siding is requested. (b) At meeting points, the RTC must not line a train or transfer into a siding until the switch at the opposite end …
78.944