Search
Displaying 51 to 60 of 132 items.
… Whether current funding mechanisms are sufficient to support safety enhancements to the rail transportation … its findings and recommendations. Two Vice-Chairs will support the Chair in leading the review, and will ensure a … will be supported by a dedicated Secretariat assigned to support the Panel in planning, executing, and reporting on …
4.696
… Department of Transport require major Canadian passenger and freight railways implement physical fail-safe train … group with representatives from the railways, the unions and Transport Canada to study the issue of fail-safe train … with a special focus on the high-speed rail corridors and to provide Transport Canada with options and …
17.858
… Non-Signalled Sidings (a) When two opposing train(s) or transfer(s) are to be lined into the same non-signalled … before the signal to permit operation of either train or transfer into the siding is requested. (b) At meeting points, the RTC must not line a train or transfer into a siding until the switch at the opposite end …
78.944