Search
Displaying 281 to 290 of 523 items.
… 5.0 CANCELLATION OF APPROVAL 5.1 General 5.2 Conditions and Means for Cancellation 5.3 Airworthiness Directives 5.4 … the same as for a non EROPS Type Approval or Type Approval re-issue. These items will be coordinated within the Branch … OPI OTI OPI OTI OPI OTI 1. Programs Engineering/Flt.test 1. Programs accept Airworthiness 1. Coordinate Review …
55.424
… of the data. This could be a modified paper holdover time (HOT) table, an electronic presentation of a HOT table, or an electronic application (App) in an … bag (EFB). (b) Degree-Specific Holdover Time : Means the HOT calculated at degree decrements beginning at 3°C down to …
27.608