Search
Displaying 11 to 20 of 427 items.
… Plan ( PORCP ) is to establish a national framework and approach which, with associated regional measures, will provide for an effective and efficient response to requests from ships in need of … evacuate the crew or other persons on board should be re-directed by the Maritime Assistance Service ( MAS ) to the …
129.202
… PLAN 4.1 PROGRESS DURING FISCAL YEAR 2013-2014 4.2 STATUS AND ACTION PLAN FOR THE NEXT FISCAL YEAR AND SUBSEQUENT YEARS 1. Introduction This document provides … to be completed in 2013-14. An operating effectiveness re-assessment and remediation was completed in 2013-14. …
113.498
… TP 13090 - Aircraft Leasing Procedures Manual (PDF, 114 KB) July 2003 … to Issue a Leasing Authorization 1.7 Role of the Regional Aircraft Registration and Leasing Division 1.8 Leasing … 1.9 The Lease 1.10 Certificate of Registration of Leased Aircraft/Lease Interchange 1.11 Complex Leasing Transactions …
122.706
… in April 2018, with regards to Port State Control (PSC) Inspection, TC approved the policy on inspecting U.S. … Workstream A: NATIONAL RCC PLAN Port State Control (PSC) Inspections: Planned initiatives and sub-deliverables … B: GREAT LAKES & ST. LAWRENCE SEAWAY Port State Control (PSC) Inspections: Joint PSC inspections were carried out in …
8.01
… INSTALLATIONS PART IV: SOLAS CHAPTER II-2 CONSTRUCTION – FIRE PROTECTION, FIRE DETECTION AND FIRE EXTINCTION PART V: SOLAS CHAPTER III … 9.4.1.1.2, the following requirements must be met: Every door in an "A" class division must: overlap the door frame at …
117.434
… secondary core (i.e., at least 10,000 persons) of CMAs. Key Route Definition “Key Route” means any track on which, over a period of one … loaded tank cars and loaded intermodal portable tanks. “Key Route” means any track on which, over a period of one …
102.51
… II - Procedures TP 13585 E - Environmental Prevention and Response National Preparedness Plan (PDF, 66.2 KB) … Framework See Attachment – Environmental Prevention and Response Program Framework. 1.0 Purpose 1.1 The purpose … the Canada Shipping Act, 2001 ( CSA 2001 ) include: to certify RO s and evaluate their activities that include, but …
102.829
… Plan 4.1 Progress during fiscal year 2012-2013 4.2 Status and action Plan for the next fiscal year and subsequent years 1. Introduction This document provides … was unable to continue planned on-going monitoring to re-assess the operating effectiveness of Revenue and …
99.468
… projects indicated that the forecasted extension in asset life due to funding was realized. Case studies conducted at … airports, protection of assets and increase in life at ACAP-eligible airports and reduced operating costs at … 26% in PNR and 10% in Quebec Footnote 5 . Over the life of the program, approximately twenty percent Footnote 6 …
7.331