Search
Displaying 1 to 10 of 24 items.
… to date, the accident occurred when the engineer left the cab of the locomotive to operate a derail after having … left his position on the ground and entered the locomotive cab. While in the cab, the locomotive engineer inadvertently moved the …
3.65
… to Remedy Non-compliance QC 5(b), 5(c) 3.5(1)(c), 5.14 CSA B625 – 6.1.2(e) N/A N/A 2021-06-23 Name of offender withheld … offender withheld Detention Notice BC 5(c) 5.14(1)(b) CSA B625 6.1.1 N/A N/A 2021-10-06 Name of offender withheld Detention Notice BC 5(c) 3.5(1)(f) CSA B625 6.1.1 N/A N/A 2021-10-14 New Gold Inc. Ticket ON 5(b) …
2.596