Search
Displaying 71 to 80 of 248 items.
… – Application 0.4 - Responsibility Part B – Qualifications and Designation of Responsible Persons 1.1 – Scope 1.2 – … Capacities 2.3 – Protection of Bridges from Over-weight and Dimensional Loads 2.4 – Protection of Safe Railway … Inspections 3.3.3 Underwater Inspections 3.3.4 Vegetation and Drainage Channel Inspection 3.4 – Scheduling of Bridge …
8.95
… 10 . General Design 10.1 The locomotive shall be designed and constructed to provide for safe operation and protection … the horn manufacturers Certificate of Compliance and test records for not less than 10 years. (b) On new and … and ERMM shall be inspected and tested on an annual basis; test results shall be maintained for one year by the railway …
52.614
… 805. Manual and Other Interlockings not specified in these rules – Protection of Track Units and Track Work See special instructions. 806. Automatic … the foreman must then unlock the box marked “switches”, and open the switch at the interlocking. The switch must not …
52.801