Search
Displaying 471 to 480 of 839 items.
… review and analysis of fifteen 2-m diameter pool fire tests (fueled by heptane, Bakken crude oil, and diluted … part of test report TP 15465, “Rail tank cars exposed to fire: Analysis of thermal conditions in a railcar engulfed in a crude oil fire (Series 1-3 Tests) – March 24, 2021”. Sandia’s …
60.005
… Non-Signalled Sidings (a) When two opposing train(s) or transfer(s) are to be lined into the same non-signalled … before the signal to permit operation of either train or transfer into the siding is requested. (b) At meeting points, the RTC must not line a train or transfer into a siding until the switch at the opposite end …
78.944