Search
Displaying 41 to 50 of 642 items.
… Appendix B when providing air traffic control service to aircraft using MLAT as the surveillance system. NAV CANADA … of potential conflicts between IFR/VFR and VFR/VFR aircraft that are radar identified and in communication with … In the provision of separation or conflict resolution, aircraft shall be separated vertically by a minimum of 500 …
108.044
… time determination report (HOTDR) within their approved Ground Icing Operations Program from the requirements related … element of Holdover Timetables (HOT) forming part of the Ground Icing Operations Programas stipulated in sections 1.0, 3.0, 6.0, 6.2, 6.3 and 7.1.1.1 of Standard 622.11, Ground Icing Operations, made pursuant to subsection …
34.758
… installed the greater distance of: at least 61 m from the runway centreline; or, outside of the graded area of the runway strip. where local geography is preventing placement … system. 5. The airport operator shall verify that the locations of all aircraft arresting systems are accurately …
28.536
… installed the greater distance of: at least 61 m from the runway centreline; or, outside of the graded area of the runway strip. where local geography is preventing placement … system. 5. The airport operator shall verify that the locations of all aircraft arresting systems are accurately …
28.96