Search
Displaying 281 to 290 of 799 items.
… Short Title/Definitions Application Emergency Electrical Power Schedule 2 Part I General Requirements for Ships of … Plant Additional Requirements for A.C. Supply Systems with Voltages 1 kV and Above Hazardous Locations Testing & … dangerous temperature rises reached by any part in contact with the explosive mixture; this implies that the …
118.586
… restricted airspace was disseminated and stored under the NOTAM files for the Montréal flight information region (FIR) … (CZYZ) and the Ottawa/MacDonald Cartier Airport (CYOW). A NOTAM issued under NOTAM file CYND—for Ottawa/Rockliffe and other aerodromes in …
37.125
… RNP APCH: Required Navigation Performance Approach; ROC: Required Obstacle Clearance; SBAS: Satellite-Based … This is the product of the Required Obstacle Clearance (ROC) being based on a ratio rather than a fixed amount of … types of operations. A single required obstacle clearance (ROC) value is applied over the length of the segment. Figure …
1.927