Search
Displaying 91 to 100 of 206 items.
… be measured, as their length can vary significantly. 10.0.3 Selecting a Grade Crossing Design Vehicle It is not … Railway Crossing sign, signal, stop sign, or pavement stop line. 10.1.2 The clearance point is the point 2.4 meters … over the grade crossing. non-standard placement of stop line pavement markings. the road gradient from where the …
1.263
… Article 12 – Warning System Operation Article 13 – Number and location of … 15 – Bells and gates Article 16 – Circuitry Article 17 – Warning systems and traffic signals installed at grade crossings in lieu of a warning system – Inspection and testing Article 12 - Warning …
59.27
… to replace the former, annotated plan at the site (GCR 93(3)). Doors covers and fastenings should be kept in good … Directorate office having jurisdiction over the railway line at the location of the proposed railway works. For … after the day on which the change is made (GCR 9). If a line of railway at a public grade crossing is transferred …
8.839
… Evidence of repeat incidents of unauthorized access to the line of railway. Note: If the DSA reveals conditions that …
0.508