Search
Displaying 1 to 10 of 34 items.
… crossings. These sightlines must, at minimum, provide crossing users with enough time to see and react to an … positions. This Guide replaces the Minimum Railway/Road Crossing Sightline Requirements for All Grade Crossings … 20, 21 and 22; and in GCS, article 7; enable grade crossing users to safely see and react to an oncoming train. …
96.571
… cancellation of authorities, instructions or information. ENGINE A locomotive(s) operated from a single control or a cab control … (SBU), or an occupied caboose, distributed power remote locomotive consist or distributed braking car, when the last …
14.694
… 1. Time The 24 hour system will be used and will be expressed in … The digits 2359 or 0001 will be used to express the time at midnight. 2. Watches Every conductor, assistant … in a 24 hour period; (ii) set it to reflect the correct time if it reflects a variation of more than 30 seconds; …
90.216
… proceed to the next point where repairs can be made. 26. Blue Signal Protection (a) A blue flag by day, and in addition a blue light by night or when day signals cannot be plainly …
5.175