Transport Publication - TP 14707 E (2010)
Annex 1 Part 1 (Steps 2, 3,and 4)
Information on the Ship and its Current Status
Information on the Request
Information on the Ship Request (as per A.949(23)) | |
---|---|
Information Provided by the Ship | Marine Safety's Comments |
What assistance is required?
(for example; lightering, pollution combating, towage, stowage, salvage, storage, repairs...) |
|
State the reasons for the ship's need for assistance.
Cause and extent of damage or problem (for example; fire, explosion, damage to ship, including mechanical or structural failure, collision, pollution, impaired stability, grounding...) |
|
What are the hazards and associated risk and estimated consequences of potential casualty if the ship:
|
|
Describe the Problem and Associated Issues:
(Briefly summarize the problem and issues, from Canada's perspective) |
|
Annex 1 Part 2 (Step 1)
Information on the Ship and its Current Status
Additional Ship Information
Ship Contact Information
- Ship Identity – name, flag, identity/ IMO / MMSI number
- Master’s name and nationality – Still on board?
- Name of person on the ship making the request, date and time
- Last port of call
- Working language on board
- Security (certificate, level)
- Local representative of the company (name, address, telephone number, email address)
- Registered owner (name, address, telephone number, email address)
- Registered company (name, address, telephone number, email address)
- If bare-boat charterer (name, address, telephone number, email address)
- Classification society local representative (name, address, telephone number, email address)
- Is the ship insured? Ship’s insurers and limits of liability available (name, address, telephone number, email address)
- Local P&I Club representative (name, address, telephone number, email address)
Ship Particulars
- Type of ship
- Size (tonnage), length, beam and draft of ship, air draft
- Year constructed
- Propulsion, thrusters
- Anchoring gear
- Towing Gear
- Fuel (type, quantity)
- Nature and condition of cargo, stores, bunkers, in particular hazardous goods, (type, quantity, condition)
- Ballast
Current Status
- Position of ship (and how determined)
- Course and speed (making way, adrift or at anchor) and route information
- Weather, sea and ice conditions, and forecast weather conditions
- Status of crew/salvors/other (number on board and assessment of human factors, including fatigue)
- Details of any casualties on board or in the vicinity of the ship
- Actual pollution or potential for pollution
- What is the urgency of the situation and the likelihood of the potential casualty
- Sea room (depth, drift, traffic density)
- Has the Classification Emergency Response Unit been contacted and supplied with information?
Ship Condition (damage/defects/deficiencies)
- Seaworthiness of the ship (buoyancy, stability, list, trim)
- Status of propulsion and power generation, and steering
- Status of essential shipborne navigational aids
- Details of changes in ship condition since initial event
Assistance Information
- Master’s/Salvor’s intentions
- Names of vessels in vicinity or assisting in situation
- Response actions taken by a ship ( i.e. , salvors contacted, engaged, at scene)
- Distance and time to a place of refuge
- Details of what is required from a place of refuge
- Docking ability
- Is anchoring possible
- Can the ship be accessed by helicopter
Annex 2 Part 1 (Step 3)
List of Potential Risk Assessment Team Members and Stakeholders
- TC Marine Safety (Ship Rapid Assessment Team, ship technical and operational expertise, routing)
- DFO – CCG (response, spill and clean-up expertise)
- DFO (scientific and operational expertise on fisheries, ocean, habitat)
- Environment Canada (Regional Environmental Emergency Team input, weather forecast)
- Ship Inspection Team
- TC Legal Services
- TC Security
- TC Communications
- Provincial authorities
- Municipal authorities
- Port authorities/harbour master
- Classification society
- Emergency services (police, fire)
- Response organization
- Pilots
- Salvage companies
- Shipyards
- Surveyors
- Cargo handling facilities
- Health officials
- Chemical industry
- Canada Customs and Revenue Agency ( CCRA )
- Seafarer associations
- Search and Rescue ( SAR )
- Department of National Defense ( DND )
- Foreign Affairs Canada ( FAC )
- US / authorities
- Flag State
- Parks Canada (marine parks)
- Aboriginal groups
- Shipping industry
- Fishing industry
- Recreational Boating industry
Annex 3 (Step 5.1)
Criteria for Selecting a Suitable Place of Refuge
What is needed by the ship to address the problem? | Suitability of Options | |||
---|---|---|---|---|
Potential Requirements | Details | Refuge A | Refuge B | Refuge C |
Shelter (weather, sea, swell, ice) | ||||
Safe anchorage (holding ground, depth) | ||||
Facilities/Equipment - reception facilities, transfer facilities i.e. pumps, hoses, barges, lighering | ||||
Repair facilities - shipyard, cranes, cargo gear, personnel | ||||
Salvage and Towage | ||||
Emergency facilities - fire fighting | ||||
Docking requirements (draught, length, availability) | ||||
Sea room to manoeuvre | ||||
Other | ||||
Other Place of Refuge Considerations | ||||
Navigation (traffic, unobstructed approach, pilots, tides, currents, ice , anchorage) | ||||
Assistance nearby, if needed (Oil and chemical response, salvage, towage) | ||||
Distance to refuge versus urgency | ||||
Accessibility by land, sea, and air | ||||
Ability of refuge to contain or limit the spread of pollution | ||||
Characteristics of refuge that would reduce the impact of pollution or facilitate clean-up | ||||
Emergency Response Capacities ( i.e. : SAR , evacuation, medical, HAZMAT ) | ||||
Is there a site suitable for beaching the problem ship if necessary | ||||
Security, ability to restrict area, access | ||||
Weather and Sea Conditions (prevailing wind, tide, current, ice, weather, sea) |
Annex 4 (Step 6.1)
Areas That Could be Put at Risk in the Event of a Casualty
Health, Safety and Security
- Public safety/security - consider distance to populated areas, size
- Persons on board
- Responders
- Salvors
- Persons in vicinity of ship
- Other ships – collision
- Air quality, contamination
Environmental
- Sensitive areas (habitat, species), ecological reserve or protected area,
- Wildlife (marine, terrestrial, avian)
- Waters in vicinity of ship
- Adjacent coastlines
- Neighboring countries ( US )
Socio-Economic
- Communities and business interests – consider distance to communities and industrial area
- Impact on fisheries – offshore, approaches, shellfish
- Tourism – coastline, beaches, sightseeing, hotels, waterfront activities
- Public and private property
- Infrastructure – bridges, channels, blockage, dock facilities, other installations
- Port delays/disruption
- Costs – i.e. , salvage, environmental clean up, transport, cargo handling/lightering, surveying, pilotage, towage, moorage, harbour dues, specialists, special measures, waste disposal, material damage, personal damage, repatriation of crew/passengers, emergency services, repair and shipyard, removal of wreck
- Marine transportation system
- Offshore oil and gas activities
- The ship and its cargo
Annex 5 (Step 6.2)
Probability and Severity of Adverse Consequences and the Overall Risk Level
Estimate Severity of Adverse Consequences:
The severity of the overall consequences associated with a risk scenario can be categorized as follows:
Catastrophic: multiple deaths, multiple major injuries, extreme property or environmental damage, extreme negative impact on the economy, major national or long term impact.
Severe: death, major injuries, severe property or environmental damage, loss of the ship, major risk to safety or restriction to shipping, regional impact.
Significant: many injuries, significant property or environmental damage, short-term consequences, local impact
Minor: some minor injuries, some property or environmental damage, minor short-term consequences.
Estimate Probability of Adverse Consequence:
The overall probability associated with a risk scenario can be categorized as follows:
Highly probable: almost certain the accident will occur.
Probable: accident likely to occur.
Unlikely: accident could occur.
Improbable: accident not likely to occur.
Estimate the Overall Risk Level
The following risk matrix can be used to help determine and categorize the overall risk level for each option. This estimate can then be used to help compare one option with another.
Severity of Adverse | Probability of Adverse Consquences Over Time | |||
---|---|---|---|---|
Consequence | Highly Probable | Probable | Unlikely | Improbable |
Catastrophic | 9 | 8 | 7 | 5 |
Severe | 8 | 7 | 6 | 3 |
Significant | 7 | 6 | 4 | 2 |
Minor | 5 | 3 | 2 | 1 |
Risk Level: Low (1-3) - Medium (4-6) - High (7-9)
Annex 6 (Step 5 and 6)
Assessment Details - (One per Option)
(Step 6, Annex 5)
Specify:
Specify:
(Step 7)
Annex 7 - Flow Chart (Communications)
Click here to enlarge the image
Annex 8 - Checklist
Step | Action | Yes | No |
---|---|---|---|
1 | Obtain Situation Report and/or Information from the ship,
MCTS
, agent or other sources.
Commence the Annex 1 form. |
||
2 | Summarize
TCMS
’s concerns on hazards and associated issues.
Complete Annex 1 form. |
||
3 | Identify possible risk assessment team members (
TC
,
CCG
,
EC
,
USCG
,
etc.
)
Identify other interested stakeholders Review potential assessment team members and stakeholders on Annex 2. |
||
4 | Preliminary analysis of current situation with the assessment team.
Identify the risks, hazards, immediate action needed for POR request. Decide if an inspection team needs to be deployed. Complete Annex 3 form. |
||
5 | Identify feasibility of each of the potential
POR
locations using information available
Annex 3 form. Review members of risk assessment team and interested stakeholders |
||
6 | Estimate the risks and hazards for each option for
POR
.
Use Annex 4 to assist in process. Estimate the risk level using Annex 5. Identify risk control measures and their impact. Evaluate and compare POR options. |
||
7 | Evaluate and compare the options for
POR
.
Complete Annex 6 form - one for each option. |
||
8 | Decision – grant or deny access to a POR with control measures. | ||
9 | Review and agree on ship’s proposed action plan.
Monitor implementation of action plan. |
||
10 | Debrief
POR
process with assessment team and stakeholders.
Obtain feedback from assessment team on process. |
||
Ensure that the entire process for application for places of refuge has been documented thoroughly |
________________________
Marine Safety Inspector (Print Name)
_________________________
Manager Compliance and Enforcement (Print Name)