The following table sets out the infrastructure projects that have been approved for Rail Safety Improvement Program, infrastructure, technology and research (RSIP-ITR) funding.
Previous years
Province | Applicant | Project | Contribution 2019-2020 | Contribution 2020-2021 | Total TC Share |
---|---|---|---|---|---|
AB | City of St. Albert | Mile 4.48 Sangudo Subdivision, Riel Drive - Resurface crossing and approaches, add median separation, add/upgrade pedestrian protection at an existing crossing, add/upgrade other pedestrian safety measures. | $90,000.00 | $0.00 | $90,000.00 |
AB | City of St. Albert | Mile 4.97 Sangudo Subdivsion, Meadowview Drive - Resurface crossing and approaches, realign road approaches, add median separation, add street lighting at crossing, add/upgrade pedestrian protection at an existing crossing, add/upgrade other pedestrian safety measures, redesign and relocate an existing site access out of the rail right of way. | $200,000.00 | $0.00 | $200,000.00 |
AB | City of Leduc | Mile 0.19 Breton Subdivision, 48th St - Add Standard Railway Crossing Signs, add street lighting at crossing, add/upgrade pedestrian protection at an existing crossing, add/upgrade other pedestrian safety measures, improved signage, solutions to access control issues, installation of traffic signals to control intersection movements during train crossings. | $439,016.00 | $0.00 | $439,016.00 |
AB | Canadian Pacific Railway | Mile 5.28 Hoadley Subdivision, Range Road 274 - Add Flashing Lights and Bells, and gates, install Constant Warning Times. | $190,560.00 | $0.00 | $190,560.00 |
AB | Canadian Pacific Railway | Mile 0.17 Cousins Industrial Spur Subdivision, Range Road 274 - Add Flashing Lights and Bells, Type C track circuits resurface crossing and approaches. | $204,295.50 | $0.00 | $204,295.50 |
AB | Canadian Pacific Railway | Mile 1.12 Laggan Subdivision, 11th Street/9th Avenue SW - Adding Flashing Lights and Bells, and gates, add/upgrade pedestrian protection at an existing crossing, add/upgrade other pedestrian safety measures, install audible way finder devices. | $246,782.50 | $0.00 | $246,782.50 |
AB | Canadian Pacific Railway | Various Miles Laggan Subdivision, Various Roads - Solutions to access control issues (add fencing). | $80,000.00 | $0.00 | $80,000.00 |
AB | Canadian National Railway | Mile 0.05 Westlock Subdivision Dungevan Road/127th Avenue - Upgrade to Constant Warning Times, replace gates. | $187,416.00 | $0.00 | $187,416.00 |
AB | Canadian National Railway | Mile 51.8 Edson Subdivision, Main Street - Add Flashing Lights and Bells, and/or gates, upgrade to Constant Warning Times. | $170,373.00 | $0.00 | $170,373.00 |
AB | Canadian National Railway | Mile 38.43 Edson Subdivision, RR 32 -Upgrade to Constant Warning Times, replace gates. | $183,508.50 | $0.00 | $183,508.50 |
AB | Canadian National Railway | Mile 7.2 Westlock Subdivison, Sturgeon Road- Add Flashing Lights and Bells, and/or gates, upgrade to Constant Warning Times. | $150,441.00 | $0.00 | $150,441.00 |
AB | Canadian National Railway | Mile 54.9 Edson Subdivision, Seba Road - Add Flashing Lights and Bells, and/or gates, upgrade to Constant Warning Times. | $170,373.00 | $0.00 | $170,373.00 |
AB | Canadian National Railway | Mile 23.26 Peace River Subdivision, Twp Rd 810 - Add Flashing Lights and Bells, and/or gates, upgrade to Constant Warning Times. | $160,309.00 | $0.00 | $160,309.00 |
AB | Canadian National Railway | Mile 35.37 Edson Subdivision, RR 25 - Upgrade to Constant Warning Times, replace gates. | $184,432.50 | $0.00 | $184,432.50 |
AB | Canadian National Railway | Mile 258.15 Wainwright Subdivision 17th Street -Add Flashing Lights and Bells, and/or gates. | $191,874.00 | $0.00 | $191,874.00 |
AB | Canadian National Railway | Mile 3.81 Camrose Subdivision, 84th Ave. - Add Flashing Lights and Bells, and/or gates, upgrade to Constant Warning Times. | $163,764.50 | $0.00 | $163,764.50 |
AB | Canadian National Railway | Mile 57.13 Vegreville Subdivision, 50th Street - Add Flashing Lights and Bells, and/or gates, upgrade to Constant Warning Times, add/upgrade other pedestrian safety measures, remove cantilevers. | $170,482.00 | $0.00 | $170,482.00 |
AB | Canadian National Railway | Mile 116.73 Edson Subdivision, Roseavear Rd - Add Flashing Lights and Bells, and/or gates, upgrade to Constant Warning Times. | $166,027.00 | $0.00 | $166,027.00 |
AB | Canadian National Railway | Mile 125.94 Edson Subdivision, Rural Road 170 - Upgrade to Constant Warning Times, replace gates. | $206,983.00 | $0.00 | $206,983.00 |
BC | Canadian Pacific Railway | Mile 43.16 Shuswap Subdivision, Solsqua-Sicamous Rd- Add gates. | $88,256.50 | $0.00 | $88,256.50 |
BC | Canadian Pacific Railway | Mile 63.22 Shuswap Subdivision, Ross Street - Grade Separation. | $500,000.00 | $0.00 | $500,000.00 |
BC | Canadian National Railway | Miles 102.92 Yale Subdivision, Glover Rd - Upgrade to Constant Warning Times, add/upgrade pedestrian protection at an existing crossing, add extra set of lights and a cantilever, extend track circuits. | $357,192.50 | $0.00 | $357,192.50 |
BC | Canadian National Railway | Mile 147.2 New Westminster Subdivision, Cariboo Road - Add/upgrade pedestrian protection at an existing crossing, add cantilever. | $78,378.00 | $0.00 | $78,378.00 |
BC | Canadian National Railway | Various Miles Burrard Inlet Branch Subdivision, Various Roads - Upgrades to LED. | $37,211.88 | $0.00 | $37,211.88 |
BC | Canadian National Railway | Mile 1.1 Kitimat Subdivision, Old Airport Road - Add Flashing Lights and Bells, and/or gates, upgrade to Constant Warning Times. | $157,663.50 | $0.00 | $157,663.50 |
MB | Town of Ste. Anne | Mile 125.34 Sprague Subdivision, St. Gerard St. – Grade Crossing Closure | $25,000.00 | $0.00 | $25,000.00 |
MB | Canadian Pacific Railway | Mile 0.96 Rocanville Subdivision, PTH 1 - Add Flashing Lights. | $43,426.00 | $0.00 | $43,426.00 |
MB | Canadian Pacific Railway | Mile 10.37 Broadview Subdivision, Rd 56 N - Add Flashing Lights and Bells, and gates, install Constant Warning Times. | $150,357.50 | $0.00 | $150,357.50 |
MB | Canadian Pacific Railway | Mile 46.14 Broadview Subdivision, Rd 152 W - Add Flashing Lights and Bells, and gates, install Constant Warning Times. | $206,418.50 | $0.00 | $206,418.50 |
MB | Canadian Pacific Railway | Mile 127.26 Carberry Subdivision, Provincial Rd 468 – Add gates. | $94,489.00 | $0.00 | $94,489.00 |
MB | Canadian Pacific Railway | Mile 5.39 Arborg Subdivision, Highway No. 101 - Add Flashing Lights. | $6,678.50 | $0.00 | $6,678.50 |
MB | Canadian Pacific Railway | Mile 22.51 Winnipeg Beach Subdivision, PTH 4 – Add Flashing Lights | $5,795.00 | $0.00 | $5,795.00 |
MB | Canadian Pacific Railway | Mile 5.76 Winnipeg Beach Subdivision, PTH 101 -Add Flashing Lights. | $5,578.00 | $0.00 | $5,578.00 |
MB | Canadian Pacific Railway | Mile 1.62 Rocanville Subdivision, PR 259 - Add Flashing Lights and Bells, Type C track circuits. | $150,357.00 | $0.00 | $150,357.00 |
MB | Canadian Pacific Railway | Mile 24.35 Broadview Subdivision, PTH 21 - Add Flashing Lights and Bells, gates and upgrade to Constant Warning Times. | $190,185.00 | $0.00 | $190,185.00 |
MB | Canadian National Railway | Mile 0.92 St. Boniface Lead, off Sprague Subdivision, Marion Rd. -Upgrade to Constant Warning Times, replace gates. | $214,955.50 | $0.00 | $214,955.50 |
MB | Canadian National Railway | Mile 172.36 Rivers Subdivision, Hwy #24 - Upgrade to Constant Warning Times, replace gates. | $193,072.50 | $0.00 | $193,072.50 |
MB | Canadian National Railway | Mile 159.83 Rivers Subdivision, Hwy #21 - Upgrade to Constant Warning Times. | $191,299.50 | $0.00 | $191,299.50 |
NB | City of Moncton | Mile 124.41 Springhill Subdivision, Robinson St. - Add/upgrade other pedestrian safety measures. | $120,400.00 | $0.00 | $120,400.00 |
NB | City of Moncton | Mile 123.47 Springhill Subdivision, Elmwood Dr. - Add street lighting at crossing, add/upgrade other pedestrian safety measures. | $105,500.00 | $0.00 | $105,500.00 |
NB | City of Moncton | Mile 124.26 Springhill Subdivision, Church Street - Add/upgrade other pedestrian safety measures. | $130,400.00 | $0.00 | $130,400.00 |
NB | City of Moncton | Mile 124.39 Springhill Subdivision, Victoria St. - Add/upgrade other pedestrian safety measures. | $130,400.00 | $0.00 | $130,400.00 |
NB | City of Moncton | Mile 124.45 Springhill Subdivision, Queen St. - Add/upgrade other pedestrian safety measures. | $144,240.00 | $0.00 | $144,240.00 |
NB | City of Moncton | Mile 124.49 Springhill Subdivision, Lutz St. - Add/upgrade other pedestrian safety measures. | $138,240.00 | $0.00 | $138,240.00 |
NB | City of Moncton | Mile 124.27 Springhill Subdivision, St. George St. - Add/upgrade other pedestrian safety measures. | $32,666.81 | $0.00 | $32,666.81 |
NB | New Brunswick Southern Railway | Mile 11.04 McAdam Subdivision, Epworth Park Rd. – Upgrade to LED | $3,272.00 | $0.00 | $3,272.00 |
NB | New Brunswick Southern Railway | Mile 10.7 McAdam Subdivision, Pamdenac Road – Upgrade to LED | $4,132.80 | $0.00 | $4,132.80 |
NB | New Brunswick Southern Railway | Mile 0.57 Courtney Bay Subdivision, Hanover Street - Upgrade to LED. | $3,272.00 | $0.00 | $3,272.00 |
NB | New Brunswick Southern Railway | Mile 1.62 McAdam Subdivision, Douglas Avenue - Upgrade to LED. | $4,862.40 | $0.00 | $4,862.40 |
NB | New Brunswick Southern Railway | Mile 83.92 Sussex Subdivision, Recycle Street - Upgrade to LED. | $4,132.80 | $0.00 | $4,132.80 |
NB | New Brunswick Department of Transportation and Infrastructure | Mile 92.06 Springhill Subdivision, Westcock Hill - Resurface crossing and approaches. | $52,000.00 | $0.00 | $52,000.00 |
NB | Canadian National Railway | Mile 105.63 Springhill Subdivision, Route La Vallee (Route 106) - Add extra set of lights and cantilever. | $32,404.00 | $0.00 | $32,404.00 |
NB | Canadian National Railway | Mile 103.8 Springhill Subdivision, St-Thomas (Route 925) - Add extra set of lights. | $5,974.50 | $0.00 | $5,974.50 |
NB | Canadian National Railway | Mile 118.71 Springhill Subdivision, Shediac Road (Route 134) - Add extra set of lights. | $5,974.50 | $0.00 | $5,974.50 |
NB | City of Moncton | Various Miles, Springhill Subdivision , Near Main St. - Solutions to access control issues (e.g. authorize access to pedestrians, add fencing, maze barriers) | $40,000.00 | $0.00 | $40,000.00 |
NB | City of Moncton | Mile 122.76 Springhill Subdivision, Mill Road- Add/upgrade other pedestrian safety measures. | $132,080.00 | $0.00 | $132,080.00 |
NB | City of Moncton | Mile 126.13 Springhill Subdivision, Main Street -Add/upgrade other pedestrian safety measures. | $40,660.00 | $0.00 | $40,660.00 |
NB | New Brunswick Department of Transportation and Infrastructure | Mile 84.2 Sussex Subdivision, Ashburn Lake - Add Flashing Lights and Bells, and/or gates, installation of Intelligent Transportation Systems, installation of a Grade Crossing Predictor system. | $260,800.00 | $0.00 | $260,800.00 |
NS | Canadian National Railway | Mile 53.49 Springhill Subdivision, Salt Spring Rd - Add cantilever. | $34,381.50 | $0.00 | $34,381.50 |
NS | Canadian National Railway | Mile 75.92 Springhill Subdivision, Chamberlain St - Add a set of lights. | $5,974.50 | $0.00 | $5,974.50 |
NS | Canadian National Railway | Mile 76.95 Springhill Subdivision, Victoria St. W- Add two extra set of lights. | $11,423.00 | $0.00 | $11,423.00 |
NS | Canadian National Railway | Mile 33.85 Springhill Subdivision, Wentworth Rd - Add Flashing Lights and Bells, and/or gates, upgrade to Constant Warning Times, add cantilevers. | $198,785.50 | $0.00 | $198,785.50 |
NS | Canadian National Railway | Mile 11.23 Springhill Subdivison, Masstown Road -Add Flashing Lights and Bells, and/or gates, upgrade to Constant Warning Times, add extra set of lights. | $176,738.00 | $0.00 | $176,738.00 |
NS | Canadian National Railway | Mile 35.24 Springhill Subdivision, Greenville Station Road - Add an extra set of lights. | $5,974.50 | $0.00 | $5,974.50 |
NS | Canadian National Railway | Mile 86.55 Springhill Subdivision, Crescent Street -Add extra set of lights. | $7,395.00 | $0.00 | $7,395.00 |
NS | Canadian National Railway | Mile 85.85 Springhill Subdivision, Crescent Street -Add two extra sets of lights. | $11,423.00 | $0.00 | $11,423.00 |
NS | Canadian National Railway | Mile 75.46 Springhill Subdivision, Anson Avenue -Add Flashing Lights and Bells, and/or gates, upgrade to Constant Warning Times, add extra set of lights. | $219,142.00 | $0.00 | $219,142.00 |
NS | Canadian National Railway | Mile 68.65 Springhill Subdivision, Riverside Drive - Add two extra sets of lights and realign actual set of lights. | $5,644.50 | $0.00 | $5,644.50 |
NS | Cape Breton Regional Municipality | Mile 6.25 Victoria Subdivision, Lingan St - Add Standard Railway Crossing Signs, add/upgrade pedestrian protection at an existing crossing, add/upgrade other pedestrian safety measures, improved signage, install advanced traffic signals on the approach to the grade crossing. | $440,000.00 | $0.00 | $440,000.00 |
ON | The Corporation of the Municipality of Oliver Paipoonge | Mile 17.57 Kaministiqua Subdivision. 5th Concession - Grade Crossing Closure. | $25,000.00 | $0.00 | $25,000.00 |
SK | Town of Dalmeny | Mile 74.04 Aberdeen Subdivision 1st Street – Resurface crossing and approaches, realign road approaches, add/upgrade pedestrian protection at an existing crossing, add/upgrade other pedestrian safety measures. | $555,200.00 | $0.00 | $555,200.00 |
ON | The Corporation of the Municipality of Oliver Paipoonge | Mile 21.97 Kashabowie Subdivision, Oliver rd. - Add/upgrade pedestrian protection at an existing crossing, add/upgrade other pedestrian safety measures, solutions to access control issues. | $93,752.00 | $93,752.00 | |
ON | Allison Farms | Mile 87.99 Unspecified Subdivision, Elmwood Dr.- Not specified | $6,000.00 | $0.00 | $6,000.00 |
ON | Ronald Lalonde | Mile 17.75 Alexandria Subdivision - Grade crossing closure. | $6,000.00 | $0.00 | $6,000.00 |
ON | Canadian Pacific Railway | Mile 90.7 Belleville Subdivision, Herchimer Rd - Add Flashing Lights and Bells, and/or gates, resurface crossing and approaches, add/upgrade pedestrian protection at an existing crossing, add/upgrade other pedestrian safety measures. | $265,800.50 | $0.00 | $265,800.50 |
ON | Canadian National Railway | Mile 143.17 Newmarket Subdivison, Bethune Road - Add Flashing Lights and Bells, and/or gates, installation of Intelligent Transportation Systems. | $154,359.50 | $0.00 | $154,359.50 |
ON | Canadian National Railway | Mile 85.31 Fort Frances Subdivision, Hwy #11 - Add Flashing Lights and Bells, and/or gates, upgrade to Constant Warning Times. | $206,153.50 | $0.00 | $206,153.50 |
ON | Canadian National Railway | Mile 140.03 Kashabowie Subdivision, Hwy #11B - Add Flashing Lights and Bells, and/or gates, upgrade to Constant Warning Times. | $176,148.00 | $0.00 | $176,148.00 |
ON | Canadian National Railway | Mile 205.47 Newmarket Subdivsion, Loxton Line - Add Flashing Lights and Bells, and/or gates, installation of Intelligent Transportation Systems. | $154,359.50 | $0.00 | $154,359.50 |
ON | Canadian Pacific Railway | Mile 42.72 Belleville Subdivision, Long Lake Road - Add Flashing Lights and Bells, and/or gates, upgrade to Constant Warning Times. | $175,904.50 | $0.00 | $175,904.50 |
ON | Canadian Pacific Railway | Mile 75.11 Hamilton Subdivision, Side Road 3 - Add Flashing Lights and Bells, and/or gates. | $70,056.50 | $0.00 | $70,056.50 |
ON | Canadian Pacific Railway | Mile 83.51 Galt Subdivision, County Road 4 - Add Flashing Lights and Bells, and/or gates. | $62,902.50 | $0.00 | $62,902.50 |
ON | Canadian Pacific Railway | Mile 109.66 Belleville Subdivision, Lawson Settlement - Add Flashing Light signal. | $24,038.00 | $0.00 | $24,038.00 |
ON | Municipality of Clarington | Mile 160.82 Belleville Subdvision, Concession Street East - Add Flashing Lights and Bells, and/or gates, resurface crossing and approaches. | $345,380.56 | $0.00 | $345,380.56 |
ON | Municipality of Clarington | Mile 164.22 Belleville Subdivision, Sucgog Street - Add Flashing Lights and Bells, and/or gates, realign road approaches, add/upgrade other pedestrian safety measures. | $249,964.65 | $0.00 | $249,964.65 |
ON | Municipality of Clarington | Mile 167.08 Belleville Subdivison, Rundle Road - Add Flashing Lights and Bells, and/or gates, resurface crossing and approaches. | $334,359.09 | $0.00 | $334,359.09 |
ON | Town of Ramara | Mile 69.76 Bala Subdivsion, Conc Road 1 -Add Flashing Lights and Bells, and/or gates, upgrade to Constant Warning Times, resurface crossing and approaches. | $177,430.23 | $0.00 | $177,430.23 |
QC | Pierre Paiment | Mile 4.75 Alexandria Subdivision - Grade crossing closure. | $6,000.00 | $0.00 | $6,000.00 |
QC | AkzoNobel Pâtes et Performances Canada | Mile 84.3 Sherbrooke Subdivison, Rue St-Patrice Est - Add flashing lights and bells, and / or barriers. | $70,000.00 | $0.00 | $70,000.00 |
QC | Municipalité de Sainte-Angèle-de-Prémont | Mile 71.38 Joliette Subdivision, Paul-Lemay Rd.- Resurfacing of the crossing and approaches, redo the approach for better visibility. | $29,148.00 | $0.00 | $29,148.00 |
QC | Canadian National Railway | Mile 65.72 Mont Joli Subdivision, Ch. De la Sablière- Add Flashing Lights and Bells, and/or gates. | $229,719.00 | $0.00 | $229,719.00 |
QC | Canadian National Railway | Mile 75.34 Joliette Subdivision, Route 348 - Upgrade to Constant Warning Times, add interconnected advance preemption. | $167,750.00 | $0.00 | $167,750.00 |
QC | Ministère des transports, de la mobilité durable et de l'électrification des transports, Direction générale de la Mauricie - Centre-du-Québec (MTMDET) | Mile 75.34 Joliette Subdivision, Route 348 – Improvement of the panels | $92,000.00 | $0.00 | $92,000.00 |
QC | Municipalité de Verchères | Mile 22.95 Sorel Subdivision, Mtée Calixa-Lavallée - Addition of barriers to the crossing. | $172,000.00 | $0.00 | $172,000.00 |
QC | Ville de Québec | Mile 1.45 Murray Bay Subdivison, 2000 Boulevarde Montmorency – Resurfacing of the crossing and approaches, adding / replacing pedestrian protection at the existing crossing. | $67,500.00 | $0.00 | $67,500.00 |
QC | Ville de Blainville | Mile 23.66 Parc Subdivision, Seigneurie Est Rd. - Add / replace pedestrian protection at existing crossing, add / replace pedestrian safety measures. | $134,805.00 | $0.00 | $134,805.00 |
QC | Ville de Magog | Mile 85.6 Sherbrooke Subdivision, Brassard - Addition of flashing lights and bells, and / or barriers, correction of the profile of the East approach. | $242,337.83 | $0.00 | $242,337.83 |
QC | Canadian National Railway | Various Miles/Subdivisions/Roads- Upgrades to LED. | $348,580.00 | $0.00 | $348,580.00 |
SK | Rural Municipality of Carmichael No. 109 | Mile 45.15 Maple Creek Subdivision, Range Road 3204- Grade Crossing Closure. | $25,000.00 | $0.00 | $25,000.00 |
SK | Town of Wapella | Mile 102.48 Broadview Subdivision, 3rd Ave. - Grade Crossing Closure | $25,000.00 | $0.00 | $25,000.00 |
SK | Town of Wapella | Mile 102.55 Broadview Subdivision, 2nd Ave. - Grade Crossing Closure | $6,000.00 | $0.00 | $6,000.00 |
SK | Agrow Canada Ltd. | Mile 262.8 Rivers Subdivision, Farm - Grade Crossing Closure | $6,000.00 | $0.00 | $6,000.00 |
SK | Regional Municipality of Grayson No. 184 | Mile 265.51 Rivers Subdivision, Unspecified Rd. - Grade Crossing Closure | $25,000.00 | $0.00 | $25,000.00 |
SK | Wesley & Annette Plosz | Mile 267.56 Rivers Subdivision, Unspecified Rd. - Grade Crossing Closure | $6,000.00 | $0.00 | $6,000.00 |
SK | Rural Municipality of Cana | Mile 268.81 Rivers Subdivision, Range Road 2050 - Grade Crossing Closure | $25,000.00 | $0.00 | $25,000.00 |
SK | Agrow Canada Ltd. | Mile 269.05 Rivers Subdivision, Farm - Grade Crossing Closure | $6,000.00 | $0.00 | $6,000.00 |
SK | Regional Municipality of Cana | Mile 270.52 Rivers Subdivision, Between Range Road 2051 & 2052 - Grade Crossing Closure | $25,000.00 | $0.00 | $25,000.00 |
SK | Canadian Pacific Railway | Mile 25.94 Swift Current Subdivision, Highway 626 (RR13) - Add Flashing Lights and Bells, and gates, install Constant Warning Times. | $193,139.00 | $0.00 | $193,139.00 |
SK | Government of Saskatchewan | Mile 10.48 Wilkie Subdivision, Highway 14 - Improved signage. | $181,200.00 | $0.00 | $181,200.00 |
SK | Government of Saskatchewan | Mile 11.35 Warman Subdivision, Highway 11 - Improved signage. | $209,630.00 | $0.00 | $209,630.00 |
SK | Government of Saskatchewan | Various Miles Lanigan Subdivision, Highway No. 6 - Improved signage, installation of Active Advance Warning System. | $204,992.00 | $0.00 | $204,992.00 |
SK | Government of Saskatchewan | Mile 22.36 Oyen Subdivision, Highway 7 – Improved Signage | $44,000.00 | $0.00 | $44,000.00 |
SK | Canadian National Railway | Mile 11.35 Warman Subdivision, Highway 11 - Add Flashing Lights and Bells, and/or gates, upgrade to Constant Warning Times. | $159,085.50 | $0.00 | $159,085.50 |
SK | Canadian National Railway | Mile 188.36 Watrous Subdivision, Lorne Avenue -Upgrade to Constant Warning Times, replace gates and add cantilevers. | $241,064.50 | $0.00 | $241,064.50 |
SK | Canadian Pacific Railway | Mile 90.16 Swift Current Subdivision, 3rd Avenue - Add Flashing Lights and Bells, and gates, install Constant Warning Times. | $218,672.00 | $0.00 | $218,672.00 |
SK | Canadian Pacific Railway | Mile 13.47 Tisdale Subdivison, Highway 310 - Add Flashing Lights and Bells, and gates, install Constant Warning Times. | $185,994.00 | $0.00 | $185,994.00 |
SK | Canadian Pacific Railway | Mile 107.26 Sutherland Subdivision, 8th St. E - Add Flashing Lights and Bells, and gates, install Constant Warning Times. | $190,185.00 | $0.00 | $190,185.00 |
SK | Rural Municipality of Buchanan No. 304 | Mile 11.91 Assiniboine Subdivision N-S Road RM 304 - Add Flashing Lights and Bells, and/or gates. | $256,566.00 | $0.00 | $256,566.00 |