Search
Displaying 601 to 610 of 842 items.
… between the measured properties of crude oil, and found that measures of flammability could be predicted, … point, vapour phase hydrogen sulfide (H2S) at two (2) test conditions (vapour/liquid ratio of 0.1:1 and 4:1), and … with the error approaching that of the laboratory test method. To look for patterns in the crude oil data, two …
49.496
… the minimum requirements for the safe handling of passengers by railway companies subject to the jurisdiction … car" means a railway car used for transportation of passengers, dining, baggage and other services in either … than a railway company) who provides passenger service on the tracks of a railway company. 3.5 "passenger train" …
61.227
… accordance with Clause 7.2.7 Pressure tests of CSA B620, tank testers have the option of performing this test through … in severe damage and personal injury in the event of tank or component failure. The risk associated with the use … are comparable to those of an explosion. Facilities and tank testers using a pneumatic test as the method of …
28.157
… mileages and speeds shown in MPH will be in numbers only. Form S - Main Track Out of Service (1) Main track out of … be protected in the manner prescribed by Rule 841. Before Form S is issued, any derail on such track must be secured in the non-derailing position or removed from the rail. Form T - Equipment Left on Main Track (1) Unattended …
35.468