Search
Displaying 251 to 260 of 302 items.
… Zipper Faults This Bulletin replaces Bulletin No. 01/1986 and has been replaced by Bulletin No. 08/1991. Note: In the … suits have been manufactured, placed on the market, and subsequently found during on board testing, to have faulty zipper closures. During donning and fastening, it has been found that the zipper teeth, after …
5.913
… with badly designed or poorly insulated exhausts, and to emphasize the importance of routine maintenance and inspection. Exhaust pipes from engines, boilers, heating … etc., should be kept well clear of combustible material and well insulated. Support brackets should also be properly …
5.867
… requires immersion suits manufactured after 1987 and used on Canadian ships to be equipped with buddy lines. 2. Immersion suits manufactured between 1987 and 1991 under approval numbers 039-070-027 and 039-070-028 by FitzWright Company, may have been supplied …
5.864
… environment. The pump casing was constructed of aluminum and the impeller was constructed of steel. The combination of … corrosion due to galvanic action between the two metals and thereby rendered the pump non-operational. It should be … stated "never pump sea water". In view of this incident and the result of the investigation, all vessel …
5.657
… who had already started to acquire qualifying service and successfully passed at least one examination required to … examinations that candidates pass between July 1, 2007 and July 1, 2012 towards a CoC under the MCR, will be treated … table set out in publication TP 2293 - The Examination and Certification of Seafarers Chapter 4, Section 4.7, Table …
5.544